Intermediate Kit

Overview

The Intermediate Kit is designed for builders who are ready to invest time and effort into the building process and possess the skills to assemble basic structures. This kit provides a solid foundation while allowing for a more hands-on building experience.

Kit Contents and Construction

  • Wings: The wings come finished with the upper skin attached. This design allows for the inside of the wing to be inspected by authorities before it is fully closed, ensuring compliance with regulations.
  • Fuselage: The fuselage truss structure is already covered with plywood skin, prepared for the gluing of the front and aft composite “turtle decks.”
  • Tail and Ailerons: The construction of the tail and ailerons, using CNC-cut parts, is left to the builder, offering an engaging and rewarding building experience.
  • Included Components: The kit includes the undercarriage, controls, hardware, and all pre-molded composite parts necessary for assembly.
  • Optional Features: Options like rescue system preparation are available to enhance the safety and functionality of your aircraft.

Kit Specifications

  • Items Not Included: The kit does not include the Firewall-Forward (FWF) kit, engine, upholstery, instruments, or paint. These components must be sourced separately.
  • Construction Time: Estimated construction time ranges from 600 to 1000 hours, depending on your experience and working pace.

Customization and Ordering

You can customize your kit by calling for the order form or configuration spreadsheet, which will guide you through the available options. Additionally, the kit can be delivered in groups without any increase in price, making it a cost-effective solution for group projects or shared builds.

The Intermediate Kit offers an excellent balance between pre-fabrication and builder involvement, providing a rewarding building experience while ensuring quality and safety.

Advanced Kit

Overview

The Advanced Kit is designed for builders who prefer a more streamlined building process with most components pre-finished, allowing for a quicker and more straightforward assembly.

Kit Contents and Construction

  • Airframe Structure: The kit includes all airframe structure components, fully finished (before paint) and ready for assembly.
  • Included Components: The kit also includes all parts for the complete undercarriage, controls and hardware. Detailed plans and a construction manual are provided to guide you through the remaining assembly steps.
  • Builder’s Tasks: Installation of controls in the fuselage, undercarriage assembly, installation of systems, paint, and engine installation are left to the builder. This approach allows for some hands-on involvement while minimizing the more complex aspects of construction.

Optional Features

  • Optional features are available, ranging from parachute rescue system preparation to the final paint application, allowing you to customize the kit to your preferences and needs.

Kit Specifications

  • Items Not Included: The kit does not include the Firewall-Forward (FWF) kit, engine, upholstery, seat belts, instruments, or paint. These items will need to be sourced separately.
  • Construction Time: Estimated construction time ranges from 400 to 800 hours, depending on your experience and the complexity of the chosen options.

Customization and Ordering

For more information and to customize your kit, you can request the order form or configuration spreadsheet. This will help you explore the various options and tailor the kit to your specific requirements.

The Advanced Kit offers a balance of convenience and builder involvement, making it an excellent choice for those who want to enjoy the building process without getting bogged down in complex fabrication tasks. It provides a faster path to completion while still allowing for a personalized touch.

ROTAX R912 UL(S) Firewall-Forward kit

Overview

The Kit is designed for an easy installation of most popular engine used in Light Aviation contemporary. 

Kit Contents

  • Engine mount and complete pads including installation HW. 
  • Carbon composite cowling, spinner, composite airbox + air filter, installation HW. 
  • Water cooler, coolers holder, knees, hoses, clamps and installation HW.
  • Throttle and choke quadrant, cockpit heating assembly, complete fuel lines including selector and gascolator, hoses, clamps and HW.
  • Exhaust pipes, SS hoses and muffler, heating exchanger, clamps and HW.

Are you interested in more information?

Do you want to visit us?

SPACEK s.r.o. I © Copyright 2024 I www.patrikorsak.cz