|
THE
SD-1 KITS, SETS AND AIRPLANES
|
|
1.
Basic kit
This kit is necessary for construction.
Contains main wing, stabilator and fin spars and pultruded carbon
strips for fuselage reinforcements.The hinges are assembled on
stabilator spar and fin spar is fitted with bushes and connection
pin. All spars have caps made of carbon fibre and are
manufactured from certified materials. Thanks to technology used
the single main wing spar does not weight more than 2 kg (4 lbs).
Construction
time of plane using basic kit and plans:800-1200 hrs
|
|
|
2.
Basic+ kit
This
kit prevents builder from most complex building stage- levelling
of wing spars and fuselage tunel together and following bushes
reaming. Company´s
fixture assures best possible precision.
Builder will receive all spars and ready to use fuselage
tunel with yet reamed bushes. It saves app. 40 hours of work and price
for 12 mm reamer.
|
|
3.
Starter kit-rudder
This
kit is suitable for builders without any former experience with
wood-foam construction. The kit contains all construction material
including hardware, cuted ribs, drawing in 1:1 scale, construction
manual, glue and varnish.
|
|
|
4.
Airframe material kit
The “Material kit” consists of wood and plywood raw material.
Kit also contains ribs, complete
undercarriage, controls, hardware and all composite
premolded parts, cabine hood shield ready to use. Plans and
construction manual. The kit could be delivered in groups without
increased price.
The
kit does not include: seat belts, upholstery, instruments, paint
Construction
time: 600-900 hours
|
|
5.
Airframe 51% kit
The
kit is suitable for builders from countries with tougher
regulation of amateur building (Germany etc.). The wings are
finished with the upper skin attached so that inside of wing could
be checked by authorities before closing. The fuselage is prepared
to the QB stage without glued tank and fin. The construction of
the tails and flaperons is left on builder.
Undercarriage, controls, hardware and all composite
premolded parts are included. Options like rescue system
preparations are available. The kit could be delivered
in groups without increased
price.
The
kit does not include: seat belts, upholstery, instruments, paint
Construction
time: 400-700 hours
|
|
|
6.
Airframe quickbuild kit
The kit contains: fuselage including fin, wings, flaperons,
stabilator, rudder. All wood varnished. Parts of complete
undercarriage, controls, cowling, hardware, plans and construction
manual. Options up to filler paint are availlable. Call for
order form. The
kit could be delivered in groups without increased price.
The
kit does not include: seat belts, upholstery, instruments, paint
Construction
time: 100-300 hours
|
|
|
SETS
|
|
1.
Undercarriage
The set contains: complete main undercarriage legs including
hinges, complete wheels with drum brakes, complete tail wheel.
|
|
2. Composite parts
The set contains all
composite parts except of Basic kit ones. Front
upper part of fuselage from firewall to cockpit containing fuel
tank ready for assembly on fuselage. Wing and horizontal tail tips.
Cabine hood. Seat. Covers of gear legs and wheels. Fuselage-wings
fillets.
|
|
3. Metal parts and hardware
Contains all metal parts and hardware used on
the airframe except of undercarriage.
|
|
4. Ribs and bulkheads
Contains ready to use CNC cut ribs of wing,
flaperons, tails and fuselage bulkheads.
|
|
SINGLE PARTS
You can buy any single
part you need for construction
|
|
READY TO FLY AIRPLANE
In
basic version with Briggs&Stratton
Vanguard (24 HP) engine, wood propeller,
basic instruments, without rescue system.
Other engines in offer: Hirth F-33 AS (28 HP),
Hirth F-23 AS (50HP), Verner JCV-360.
|
|
CALL FOR COMMON PRICE
LIST
|